Home HOME BANNER STORY ALAMIN: Meralco power interruption sa Enero 12 – 18

ALAMIN: Meralco power interruption sa Enero 12 – 18

327
0

MANILA, Philippines – Magkakaroon ng scheduled power interruptions sa ilang bahagi ng Metro Manila, Bulacan, Cavite, at Laguna mula Enero 12 hanggang 18, ayon sa Manila Electric Company (Meralco).

Ang mga ito ay dahil sa maintenance, upgrading, line reconstruction, at pole installation works.

Mga Apektadong Lugar at Iskedyul

–Bulacan

Jan. 12 (12:01–1:00 a.m. at 7:00–8:00 a.m.)
Bahagi ng Angat, Doña Remedios Trinidad, Norzagaray, San Rafael, San Ildefonso, San Jose del Monte City, at Pandi
Dahilan: Testing at repair sa Meralco–Sapang Palay substation

Jan. 16 (10:00 p.m.–3:00 a.m., Jan. 17)
Barangay Malhacan, Meycauayan City
Dahilan: Pole installation at facility upgrading

–Metro Manila

Muntinlupa City
Jan. 12 (11:30 p.m.)–Jan. 13 (4:30 a.m.) – Brgys. Alabang, Bayanan, Putatan, Tunasan
Dahilan: Pole replacement, line reconstruction, lightning protection

Taguig City (Lower Bicutan)
Jan. 13 (11:30 p.m.)–Jan. 14 (3:30 a.m.)
Dahilan: Line reconstruction sa M. L. Quezon Ave. (C-6)

Navotas City
Jan. 16 (11:30 p.m.)–Jan. 17 (4:30 a.m.)
Dahilan: Pole installation at facility upgrading

–Cavite

Silang
Jan. 15 (11:30 p.m.)–Jan. 16 (3:30 a.m.)
Dahilan: Facility upgrades at line maintenance

Tanza (Brgy. Santol)
Jan. 17 (9:00 a.m.–2:00 p.m.)
Dahilan: Pole replacement at line conversion

–Laguna

Jan. 18
Maikling interruptions sa Magdalena, Liliw, Majayjay, Sta. Cruz, at Pila (umaga at tanghali)
Dahilan: Retirement ng electrical facilities sa Malaya–Caliraya–Kalayaan transmission line

Paalala ng Meralco na mag-ingat at mag-monitor ng opisyal na advisories dahil maaaring magbago ang oras ng pagbabalik ng kuryente depende sa field conditions. RNT/MND

LEAVE A REPLY

Please enter your comment!
Please enter your name here