MANILA, Philippines – Ang Commission on Audit (COA) ay naghain ng apat na bagong fraud audit reports na nagdedetalye kung ano ang inilarawan nito bilang “rampant iregularities” sa mga flood control projects sa buong Bulacan, ang pinakabago sa mabilis na lumalagong listahan ng mga aswang at maanomalyang gawaing publiko na natuklasan sa lalawigan ngayong taon.

Sa isang pahayag na inilabas noong Biyernes, sinabi ng COA na ang mga bagong natuklasan ay may kinalaman sa mahigit P297 milyon sa mga kontratang ipinatupad ng Department of Public Works and Highways (DPWH)–Bulacan 1st District Engineering Office at iginawad sa Wawao Builders at SYMS Construction & Trading.

Ang mga proyekto, sabi ng COA, ay nagpakita ng mga paulit-ulit na senyales ng pandaraya, kabilang ang mga hindi umiiral na istruktura, hindi awtorisadong paglilipat ng proyekto, at mga pagbabayad para sa mga pader ng ilog na matagal nang naitayo bago magsimula ang mga kontrata.

“These filings reinforce our commitment to holding negligent public officials and private contractors accountable for compromised infrastructure spending,” ayon kay COA Chairperson Gamaliel Cordoba. “Our audit aims to ensure that every peso is allocated to genuine, functioning infrastructure that effectively protects vulnerable communities from flooding.”

Ang apat na fraud audit reports ay ipinadala sa Independent Commission for Infrastructure (ICI), ang parehong katawan na tumatanggap ng mga naunang ulat ng COA sa mga ghost project sa Bulacan mula noong Oktubre.

Ayon sa COA, ang mga teknikal na inspeksyon, makasaysayang satellite imagery, at mga pagsusuri sa dokumento ay lahat ay tumuturo sa mga seryosong paglabag sa pagpapatupad ng proyekto.

Ang parehong mga pattern ay lumitaw sa mga naunang pagsusumite ng COA sa ICI. Sa mga ulat na inilabas sa loob ng nakaraang buwan, nakakita rin ang mga auditor ng maraming proyekto sa pagkontrol ng baha sa Bulacan na alinman ay wala, maling lokasyon, o sinusuportahan ng mga pekeng dokumento.

Ang paghahain noong Biyernes ay nagpapatibay sa paulit-ulit na inilarawan ng COA bilang isang “systemic” na problema sa programa sa pagkontrol sa baha ng Bulacan, karamihan sa mga ito ay kinasasangkutan ng mga opisyal ng Bulacan 1st DEO at mga kontratista na nauugnay sa patuloy na pagsisiyasat ng Senado at Ombudsman.

Barangay San Nicolas, Hagonoy (Wawao Builders)

Cost: P77,199,997.92

Finding: “COA found no flood control structure at the approved site, despite documents claiming the project was 100% complete.” Satellite images confirmed the absence of any structure.

Liable individuals: Engineers Henry Alcantara, Brice Ericson Hernandez, Jaypee Mendoza, Ernesto Galang, Paul Jayson Duya, Jolo Mari Tayao, Mark Lester Castro, John Michael Ramos, and Mark Allan Arevalo.

Barangay Iba, Hagonoy (Wawao Builders)

Cost: P74,199,192.34

Finding: “[T]he riverbank protection structure was not built at the designated project location.” At the site shown by DPWH representatives, the existing wall appeared to be part of a longer barrier funded by other contracts.

Liable individuals: Alcantara, Hernandez, Mendoza, Galang, Duya, Tayao, Engineer Lemuel Roque, Engineer Sheena Morales, and Arevalo.

Guiguinto River, Malis Section (Wawao Builders)

Cost: P96,499,968.29

Finding: Historical satellite imagery revealed that a flood control structure “already existed at the approved project site years before the contract’s effectivity.” At the alternative location identified by DPWH, COA found an incomplete structure.

Liable individuals: Alcantara, Hernandez, Galang, Ramos, Tayao, Duya, and Arevalo.

Baliuag (Joint Venture of Wawao Builders and SYMS Construction)

Cost: P49,498,039.75

Finding: “[N]o flood control structure at the approved project site despite its reported completion.” The structure shown by DPWH did not match the engineering plans.

Liable individuals: Alcantara, Hernandez, Mendoza, Galang, Engineer Rafaelito Marcelo, Arevalo, and Sally Santos of SYMS.

Ayon sa COA, ang mga natuklasan ay maaaring humantong sa mga kasong administratibo at kriminal para sa mga sangkot, kabilang ang mga paglabag sa Anti-Graft and Corrupt Practices Act, malversation, falsification ng mga dokumento, at mga paglabag sa COA Circular No. 2009-001.

Ang mga kasong ito ay nagdaragdag sa higit sa isang dosenang mga proyekto sa pagkontrol ng baha sa Bulacan na nasa ilalim na ng pagsusuri ng COA—mga pagsisiyasat na iniutos noong Agosto sa gitna ng tumataas na pagkadismaya ng publiko sa diumano’y mga ghost project at katiwalian sa paggasta sa disaster mitigation.

Sinabi ng COA na dapat asahan ng publiko ang “mga karagdagang ulat” na ihahain habang umuusad ang audit. RNT/MND